Assessment Year | 1996 |
---|---|
Principal Product | Wire Fencing |
NAICS |
n/a
|
SIC | 3496: Miscellaneous Fabricated Wire Products |
Sales Range | $10 M to 50M |
# of Employees | 57 |
Plant Area |
40,000
ft2
|
Annual Production | 14,000
ton
|
Production Hrs. Annual | 6,032
hrs
|
Location (State) | Nevada |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $103,433 | 2,271,981 |
kWh
|
$0.046 |
Electricity Demand | $49,310 | 10,535 |
kW-mo/yr
|
$4.68 |
Electricity Fees | $3,326 | - |
|
- |
Natural Gas | $105,036 | 21,937 |
MMBtu
|
$4.79 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $38,375 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,061 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $235 | $100 |
$235
5,275
kWh
|
- | - | - | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $678 | $100 |
$678
14,947
kWh
|
- | - | - | - | |
03 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $1,603 | $640 |
$1,603
100,234
kWh
|
- | - | - | - | |
04 | 2.7243: Improve air circulation with destratification fans / other methods | $1,737 | $3,250 | - | - | - |
$1,737
-
MMBtu
|
- | |
05 | 2.4133: Use most efficient type of electric motors | $1,122 | $246 |
$457
7,913
kWh
|
$665
-
kW-mo/yr
|
- | - | - | |
06 | 2.7135: Install occupancy sensors | $114 | $114 |
$100
1,172
kWh
|
$14
-
kW-mo/yr
|
- | - | - | |
07 | 2.3212: Optimize plant power factor | $1,686 | $3,960 | - | - | $1,686 | - | - | |
08 | 4.212: Adopt in-house material generation | $31,200 | $2,000 | - | - | - | - | $31,200 | |
TOTAL RECOMMENDED | $38,375 | $10,410 |
$3,073
129,541
kWh
|
$679
-
kW-mo/yr
|
$1,686 |
$1,737
-
MMBtu
|
$31,200 | ||
TOTAL IMPLEMENTED | $7,061 | $8,296 |
$2,973
128,369
kWh
|
$665
-
kW-mo/yr
|
$1,686 |
$1,737
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs