*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Wire Fencing
NAICS
n/a
SIC 3496: Miscellaneous Fabricated Wire Products
Sales Range $10
M
to 50
M
# of Employees 57
Plant Area 40,000
ft2
Annual Production 14,000
ton
Production Hrs. Annual 6,032
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $103,433 2,271,981
kWh
Electricity Demand $49,310 10,535
kW-mo/yr
Electricity Fees $3,326 -
Natural Gas $105,036 21,937
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,375 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,061

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $235 $100 $235
5,275
kWh
- - - -
02 2.4221: Install compressor air intakes in coolest locations $678 $100 $678
14,947
kWh
- - - -
03 2.2449: Recover heat from exhausted steam, hot air or hot water $1,603 $640 $1,603
100,234
kWh
- - - -
04 2.7243: Improve air circulation with destratification fans / other methods $1,737 $3,250 - - - $1,737
-
MMBtu
-
05 2.4133: Use most efficient type of electric motors $1,122 $246 $457
7,913
kWh
$665
-
kW-mo/yr
- - -
06 2.7135: Install occupancy sensors $114 $114 $100
1,172
kWh
$14
-
kW-mo/yr
- - -
07 2.3212: Optimize plant power factor $1,686 $3,960 - - $1,686 - -
08 4.212: Adopt in-house material generation $31,200 $2,000 - - - - $31,200
TOTAL RECOMMENDED $38,375 $10,410 $3,073
129,541
kWh
$679
-
kW-mo/yr
$1,686 $1,737
-
MMBtu
$31,200
TOTAL IMPLEMENTED $7,061 $8,296 $2,973
128,369
kWh
$665
-
kW-mo/yr
$1,686 $1,737
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings