Assessment Year | 2008 |
---|---|
Principal Product | Vinyl Composition Tile |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 131 |
Plant Area |
250,000
ft2
|
Annual Production | 3,000,000
pieces
|
Production Hrs. Annual | 5,880
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,412,058 | 16,911,922 |
kWh
|
$0.083 |
Electricity Demand | $644,355 | 45,096 |
kW-mo/yr
|
$14.29 |
Natural Gas | $313,208 | 46,775 |
MMBtu
|
$6.70 |
Other Gas | $72,309 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $1,046,804 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $94,642 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Other Gas Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $824,374 | $6,360,000 |
$1,186,600
14,210,784
kWh
|
$436,215
-
kW-mo/yr
|
- |
$(-752,938.0)
-
MMBtu
|
$(-45,503.0)
-
MMBtu
|
|
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $41,267 | - | - | - | $41,267 | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $33,992 | $2,250 |
$25,190
301,681
kWh
|
$8,802
-
kW-mo/yr
|
- | - | - | |
04 | 2.4133: Use most efficient type of electric motors | $28,203 | $56,758 |
$20,430
244,671
kWh
|
$7,773
-
kW-mo/yr
|
- | - | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $26,826 | $81,570 |
$26,826
321,269
kWh
|
- | - | - | - | |
06 | 2.7124: Make a practice of turning off lights when not needed | $24,980 | - |
$13,335
159,703
kWh
|
- | $11,645 | - | - | |
07 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $22,978 | $11,522 |
$22,978
275,184
kWh
|
- | - | - | - | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $13,624 | $24,471 |
$13,624
163,158
kWh
|
- | - | - | - | |
09 | 2.2691: Shut off cooling if cold outside air will cool process | $10,867 | $500 |
$10,867
130,147
kWh
|
- | - | - | - | |
10 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,041 | $5,849 |
$8,041
96,294
kWh
|
- | - | - | - | |
11 | 2.7145: Install skylights | $7,467 | $22,980 |
$5,538
66,324
kWh
|
$1,929
-
kW-mo/yr
|
- | - | - | |
12 | 2.3132: Recharge batteries on during off-peak demand periods | $4,185 | - | - | - | $4,185 | - | - | |
TOTAL RECOMMENDED | $1,046,804 | $6,565,900 |
$1,333,429
15,969,215
kWh
|
$454,719
-
kW-mo/yr
|
$57,097 |
$(-752,938.0)
-
MMBtu
|
$(-45,503.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $94,642 | $81,988 |
$64,493
772,379
kWh
|
$18,504
-
kW-mo/yr
|
$11,645 | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Other Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs