| Assessment Year | 2015 |
|---|---|
| Principal Product | Fire Trucks, Fans, Lighting Towers |
| NAICS | 336120: Heavy Duty Truck Manufacturing |
| SIC | 3711: Motor Vehicles and Passenger Car Bodies |
| Sales Range | $10 M to 50M |
| # of Employees | 135 |
| Plant Area |
160,000
ft2
|
| Annual Production | 3,000
pieces
|
| Production Hrs. Annual | 4,550
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $37,715 | 924,300 |
kWh
|
$0.041 |
| Electricity Demand | $77,993 | 3,822 |
kW-mo/yr
|
$20.41 |
| Electricity Fees | $570 | - |
|
- |
| Natural Gas | $47,403 | 8,826 |
MMBtu
|
$5.37 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $17,900 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.1113: Reduce combustion air flow to optimum | $1,160 | $2,130 |
$340
8,700
kWh
|
- |
$820
-
MMBtu
|
- | - | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $470 | $480 |
$190
5,000
kWh
|
$280
-
kW-mo/yr
|
- | - | - | - | |
| 03 | 2.6218: Turn off equipment when not in use | $380 | $100 |
$380
9,800
kWh
|
- | - | - | - | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,880 | $35,080 |
$2,130
55,100
kWh
|
$4,630
-
kW-mo/yr
|
- | $90 | - | $1,030 | |
| 05 | 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system | $3,660 | $13,800 |
$720
18,500
kWh
|
$2,940
-
kW-mo/yr
|
- | - | - | - | |
| 06 | 2.8121: Apply for tax-free status for energy purchases | $3,270 | $1,000 | - | - | - | - | $3,270 | - | |
| 07 | 2.2437: Recover waste heat from equipment | $1,080 | $3,220 | - | - |
$1,080
-
MMBtu
|
- | - | - | |
| TOTAL RECOMMENDED | $17,900 | $55,810 |
$3,760
97,100
kWh
|
$7,850
-
kW-mo/yr
|
$1,900
-
MMBtu
|
$90 | $3,270 | $1,030 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs