Assessment Year | 2007 |
---|---|
Principal Product | Injection Molded Plastic Parts |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 70 |
Plant Area |
100,000
ft2
|
Annual Production | 1,767,000,000
pieces
|
Production Hrs. Annual | 8,640
hrs
|
Location (State) | Delaware |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,245,712 | 15,852,058 |
kWh
|
$0.079 |
Electricity Demand | $177,637 | 29,253 |
kW-mo/yr
|
$6.07 |
Electricity Fees | $5,649 | - |
|
- |
Natural Gas | $4,378 | 261 |
MMBtu
|
$16.77 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $245,876 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $71,262 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $93,802 | $111,140 |
$93,802
915,506
kWh
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $12,151 | $13,790 |
$11,544
112,668
kWh
|
$607
-
kW-mo/yr
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $59,111 | $104,392 |
$57,242
558,685
kWh
|
$1,869
-
kW-mo/yr
|
|
04 | 2.2511: Insulate bare equipment | $44,733 | $12,474 |
$44,733
436,590
kWh
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $3,582 | $620 |
$3,582
33,861
kWh
|
- | |
06 | 2.7232: Replace existing hvac unit with high efficiency model | $29,521 | - |
$29,521
288,125
kWh
|
- | |
07 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $2,976 | $5,832 |
$2,976
29,044
kWh
|
- | |
TOTAL RECOMMENDED | $245,876 | $248,248 |
$243,400
2,374,479
kWh
|
$2,476
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $71,262 | $118,182 |
$68,786
671,353
kWh
|
$2,476
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs