Assessment Year | 2016 |
---|---|
Principal Product | Mobile equipment for mining and metals industry |
NAICS | 336120: Heavy Duty Truck Manufacturing |
SIC | 3799: Transportation Equipment, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 203 |
Plant Area |
193,000
ft2
|
Annual Production | 50
pieces
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $208,146 | 3,730,900 |
kWh
|
$0.056 |
Electricity Demand | $52,012 | 8,166 |
kW-mo/yr
|
$6.37 |
Electricity Fees | $1,312 | - |
|
- |
Natural Gas | $84,815 | 13,960 |
MMBtu
|
$6.08 |
LPG | $45,211 | 2,266 |
MMBtu
|
$19.95 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $133,132 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,716 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.8227: Adjust / maintain fork lift trucks for most efficient operation | $33,238 | $59,500 |
$(-11,838.0)
(-212,160)
kWh
|
- |
$45,076
-
MMBtu
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,155 | $5,111 |
$3,154
56,592
kWh
|
$1,001
-
kW-mo/yr
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,962 | $350 |
$2,981
53,402
kWh
|
$981
-
kW-mo/yr
|
- | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,599 | $20 |
$2,707
48,518
kWh
|
$892
-
kW-mo/yr
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,185 | $5,958 |
$1,659
29,727
kWh
|
$526
-
kW-mo/yr
|
- | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $1,726 | $1,600 |
$1,299
23,287
kWh
|
$427
-
kW-mo/yr
|
- | - | |
07 | 2.4133: Use most efficient type of electric motors | $1,569 | $3,950 |
$967
17,324
kWh
|
$602
-
kW-mo/yr
|
- | - | |
08 | 2.7135: Install occupancy sensors | $273 | $450 |
$183
3,280
kWh
|
$90
-
kW-mo/yr
|
- | - | |
09 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $82,425 | $18,000 | - | - | - | $82,425 | |
TOTAL RECOMMENDED | $133,132 | $94,939 |
$1,112
19,970
kWh
|
$4,519
-
kW-mo/yr
|
$45,076
-
MMBtu
|
$82,425 | ||
TOTAL IMPLEMENTED | $11,716 | $5,481 |
$8,842
158,512
kWh
|
$2,874
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs