Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

38

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Light truck and utility vehicle manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UA0174 #07 Y:2016 Use adjustable frequency drive or multiple speed motors on existing system $9,033 $42,204
UA0174 #06 Y:2016 Use properly designed and sized hvac equipment $826 $2,820
UA0174 #05 Y:2016 Use optimum temperature $33,738 $8,460
UA0174 #04 Y:2016 Insulate bare equipment $221 $564
UA0174 #03 Y:2016 Use flue gases to heat process or service water $49,747 $100,000
UA0174 #02 Y:2016 Utilize energy-efficient belts and other improved mechanisms $21,405 $588
UA0174 #01 Y:2016 Utilize higher efficiency lamps and/or ballasts $435,778 $988,290
MI0228 #07 Y:2012 Reduce the pressure of compressed air to the minimum required $1,686 $80
MI0228 #06 Y:2012 Turn off equipment when not in use $2,095 $160
MI0228 #05 Y:2012 Lower temperature during the winter season and vice-versa $2,303 $80
MI0228 #04 Y:2012 Eliminate or reduce compressed air usage $3,387 $1,400
MI0228 #03 Y:2012 Install skylights $4,816 $8,484
MI0228 #02 Y:2012 Utilize higher efficiency lamps and/or ballasts $9,589 $24,600
MI0228 #01 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $15,388 $1,660
MI0226 #11 Y:2012 Utilize higher efficiency lamps and/or ballasts $656 $3,010
MI0226 #10 Y:2012 Reduce the pressure of compressed air to the minimum required $922 $80
MI0226 #09 Y:2012 Reduce the pressure of compressed air to the minimum required $1,502 $80
MI0226 #08 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $1,579 $1,660
MI0226 #07 Y:2012 Use insulation in furnaces to facilitate heating / cooling $3,519 $11,300
MI0226 #06 Y:2012 Lower temperature during the winter season and vice-versa $4,409 $80