ITAC Assessment: MI0228
ITAC logo
ITAC Assessment: MI0228
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Light Truck and Utility Vehicle
NAICS 336112: Light Truck and Utility Vehicle Manufacturing
SIC 3711: Motor Vehicles and Passenger Car Bodies
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 80,000
ft2
Annual Production 500
pieces
Production Hrs. Annual 2,496
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $122,398 1,433,278
kWh
Electricity Demand $27,893 5,704
kW-mo/yr
Electricity Fees $9,387 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,264 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,448

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $15,388 $1,660 $12,257
144,201
kWh
$3,131
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $9,589 $24,600 $7,511
88,358
kWh
$2,078
-
kW-mo/yr
03 2.7145: Install skylights $4,816 $8,484 $3,791
43,580
kWh
$1,025
-
kW-mo/yr
04 2.4239: Eliminate or reduce compressed air usage $3,387 $1,400 $2,179
25,631
kWh
$1,208
-
kW-mo/yr
05 2.7221: Lower temperature during the winter season and vice-versa $2,303 $80 $1,804
21,229
kWh
$499
-
kW-mo/yr
06 2.6218: Turn off equipment when not in use $2,095 $160 $1,641
19,310
kWh
$454
-
kW-mo/yr
07 2.4231: Reduce the pressure of compressed air to the minimum required $1,686 $80 $1,397
16,436
kWh
$289
-
kW-mo/yr
TOTAL RECOMMENDED $39,264 $36,464 $30,580
358,745
kWh
$8,684
-
kW-mo/yr
TOTAL IMPLEMENTED $34,448 $27,980 $26,789
315,165
kWh
$7,659
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs