Assessment Year | 2012 |
---|---|
Principal Product | Light Truck and Utility Vehicle |
NAICS | 336112: Light Truck and Utility Vehicle Manufacturing |
SIC | 3711: Motor Vehicles and Passenger Car Bodies |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
80,000
ft2
|
Annual Production | 500
pieces
|
Production Hrs. Annual | 2,496
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $122,398 | 1,433,278 |
kWh
|
$0.085 |
Electricity Demand | $27,893 | 5,704 |
kW-mo/yr
|
$4.89 |
Electricity Fees | $9,387 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $39,264 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $34,448 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $15,388 | $1,660 |
$12,257
144,201
kWh
|
$3,131
-
kW-mo/yr
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,589 | $24,600 |
$7,511
88,358
kWh
|
$2,078
-
kW-mo/yr
|
|
03 | 2.7145: Install skylights | $4,816 | $8,484 |
$3,791
43,580
kWh
|
$1,025
-
kW-mo/yr
|
|
04 | 2.4239: Eliminate or reduce compressed air usage | $3,387 | $1,400 |
$2,179
25,631
kWh
|
$1,208
-
kW-mo/yr
|
|
05 | 2.7221: Lower temperature during the winter season and vice-versa | $2,303 | $80 |
$1,804
21,229
kWh
|
$499
-
kW-mo/yr
|
|
06 | 2.6218: Turn off equipment when not in use | $2,095 | $160 |
$1,641
19,310
kWh
|
$454
-
kW-mo/yr
|
|
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,686 | $80 |
$1,397
16,436
kWh
|
$289
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $39,264 | $36,464 |
$30,580
358,745
kWh
|
$8,684
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $34,448 | $27,980 |
$26,789
315,165
kWh
|
$7,659
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs