ITAC Assessment: OR0570
ITAC logo
ITAC Assessment: OR0570
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Lumber
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 3,484,000
ft2
Annual Production 47,730
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $294,506 6,088,813
kWh
Electricity Demand $161,386 30,301
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $881,543 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,863

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Other Energy Savings Administrative Changes Savings Ancillary Material Cost Savings By-product Production Savings Increase in Production Savings
01 2.4239: Eliminate or reduce compressed air usage $19,863 $1,120 $26,200
526,000
kWh
- $(-5,737.0)
-
MMBtu
- $(-600.0) - -
02 2.4224: Upgrade controls on compressors $6,640 $2,250 $6,640
133,000
kWh
- - - - - -
03 2.4224: Upgrade controls on compressors $21,600 $12,010 $21,600
433,000
kWh
- - - - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $26,900 $17,900 $23,000
461,000
kWh
- - $3,900 - - -
05 2.6231: Utilize controls to operate equipment only when needed $983 $1,000 $983
19,700
kWh
- - - - - -
06 2.4131: Size electric motors for peak operating efficiency $695 $750 $695
13,900
kWh
- - - - - -
07 2.4131: Size electric motors for peak operating efficiency $157,400 $191,000 $10,300
207,000
kWh
- - - $21,100 - $126,000
08 3.1182: Make a new by-product $91,432 $156,000 $7,901
174,000
kWh
- - - - $83,531 -
09 4.112: Replace old machine with new automatic multi-station tool $543,000 $1,200,000 - - - - - - $543,000
10 2.7145: Install skylights $2,930 $9,050 $2,930
58,700
kWh
- - - - - -
11 2.3212: Optimize plant power factor $10,100 $51,900 - $10,100 - - - - -
TOTAL RECOMMENDED $881,543 $1,642,980 $100,249
2,026,300
kWh
$10,100 $(-5,737.0)
-
MMBtu
$3,900 $20,500 $83,531 $669,000
TOTAL IMPLEMENTED $19,863 $1,120 $26,200
526,000
kWh
- $(-5,737.0)
-
MMBtu
- $(-600.0) - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Other Energy Savings Administrative Changes Savings Ancillary Material Cost Savings By-product Production Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs