ITAC Assessment: OK0296
ITAC logo
ITAC Assessment: OK0296
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product BOOK DEPOSIT BOXES
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 85
Plant Area
n/a
Annual Production 50
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,032 1,173,505
kWh
Natural Gas $15,977 4,986
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,263 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,263

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,120 $5,685 $5,436
95,838
kWh
$(-316.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $771 $1,425 $659
11,430
kWh
$112
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $156 - $156
2,931
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $180 $155 $180
2,931
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $542 $1,336 $542
10,844
kWh
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $494 - $644
19,050
kWh
$(-150.0)
TOTAL RECOMMENDED $7,263 $8,601 $7,617
143,024
kWh
$(-354.0)
TOTAL IMPLEMENTED $7,263 $8,601 $7,617
143,024
kWh
$(-354.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs