ITAC Assessment: SF0620
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Treated wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $1
M
to 5
M
# of Employees 75
Plant Area 1,600,000
ft2
Annual Production 5,110,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,541,562 6,803,344
kWh
Electricity Demand $535,088 12,010
kW-mo/yr
Electricity Fees $13,544 -
Natural Gas $62,561 3,507
MMBtu
Other Gas $1 53,340
MMBtu
TOTAL YEARLY COSTS $2,152,756
RECOMMENDED SAVINGS* $2,615,351 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $101,612 $3,840 $80,068
353,344
kWh
$21,544
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $39,113 $24,553 $15,860
66,991
kWh
$7,831
-
kW-mo/yr
- $15,880 $(-458.0)
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $81,460 $95,723 $64,192
283,284
kWh
$17,268
-
kW-mo/yr
- - -
04 2.4321: Upgrade obsolete equipment $11,663 $52,983 $9,204
40,619
kWh
$2,459
-
kW-mo/yr
- - -
05 2.4321: Upgrade obsolete equipment $83,597 $429,096 $60,856
268,562
kWh
$34,161
-
kW-mo/yr
- $8,409 $(-19,829.0)
06 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $1,786,404 $4,187,700 $1,541,638
6,803,343
kWh
- $420,507 $(-175,741.0) -
07 2.3141: Use battery storage for demand control $511,502 $6,765,825 - $511,502
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $2,615,351 $11,559,720 $1,771,818
7,816,143
kWh
$594,765
-
kW-mo/yr
$420,507 $(-151,452.0) $(-20,287.0)
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs