| Assessment Year | 2017 |
|---|---|
| Principal Product | Automobiles |
| NAICS | 336112: Light Truck and Utility Vehicle Manufacturing |
| SIC | 3711: Motor Vehicles and Passenger Car Bodies |
| Sales Range | greater than $500 M |
| # of Employees | 4,600 |
| Plant Area |
3,736,000
ft2
|
| Annual Production | 366,000
units
|
| Production Hrs. Annual | 5,000
hrs
|
| Location (State) | Alabama |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $18,604,216 | 292,105,926 |
kWh
|
$0.064 |
| Natural Gas | $3,417,235 | 1,018,864 |
MMBtu
|
$3.35 |
| TOTAL YEARLY COSTS | $22,021,451 | |||
| RECOMMENDED SAVINGS* | $550,748 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $56,190 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $435,778 | $988,290 |
$435,778
6,841,100
kWh
|
- | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $21,405 | $588 |
$21,405
336,084
kWh
|
- | |
| 03 | 2.2425: Use flue gases to heat process or service water | $49,747 | $100,000 |
$(-237.0)
(-3,728)
kWh
|
$49,984
-
MMBtu
|
|
| 04 | 2.2511: Insulate bare equipment | $221 | $564 | - |
$221
-
MMBtu
|
|
| 05 | 2.2211: Use optimum temperature | $33,738 | $8,460 | - |
$33,738
-
MMBtu
|
|
| 06 | 2.7233: Use properly designed and sized hvac equipment | $826 | $2,820 |
$826
12,963
kWh
|
- | |
| 07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $9,033 | $42,204 |
$9,033
141,834
kWh
|
- | |
| TOTAL RECOMMENDED | $550,748 | $1,142,926 |
$466,805
7,328,253
kWh
|
$83,943
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $56,190 | $12,432 |
$22,231
349,047
kWh
|
$33,959
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs