ITAC Assessment: UA0174
ITAC logo
ITAC Assessment: UA0174
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Automobiles
NAICS 336112: Light Truck and Utility Vehicle Manufacturing
SIC 3711: Motor Vehicles and Passenger Car Bodies
Sales Range greater than $500
M
# of Employees 4,600
Plant Area 3,736,000
ft2
Annual Production 366,000
units
Production Hrs. Annual 5,000
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $18,604,216 292,105,926
kWh
Natural Gas $3,417,235 1,018,864
MMBtu
TOTAL YEARLY COSTS $22,021,451
RECOMMENDED SAVINGS* $550,748 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $56,190

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $435,778 $988,290 $435,778
6,841,100
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $21,405 $588 $21,405
336,084
kWh
-
03 2.2425: Use flue gases to heat process or service water $49,747 $100,000 $(-237.0)
(-3,728)
kWh
$49,984
-
MMBtu
04 2.2511: Insulate bare equipment $221 $564 - $221
-
MMBtu
05 2.2211: Use optimum temperature $33,738 $8,460 - $33,738
-
MMBtu
06 2.7233: Use properly designed and sized hvac equipment $826 $2,820 $826
12,963
kWh
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,033 $42,204 $9,033
141,834
kWh
-
TOTAL RECOMMENDED $550,748 $1,142,926 $466,805
7,328,253
kWh
$83,943
-
MMBtu
TOTAL IMPLEMENTED $56,190 $12,432 $22,231
349,047
kWh
$33,959
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs