ITAC Assessment: AS0128
ITAC logo
ITAC Assessment: AS0128
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product baked bread, pastry
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 59,942
ft2
Annual Production 8,000
ton
Production Hrs. Annual 8,112
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $202,223 2,711,899
kWh
Natural Gas $95,176 21,628
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,997 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,889

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $7,829 $4,753 $7,829
104,924
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $490 - $490
6,448
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,393 $12,076 $6,393
85,873
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $175 $300 $175
2,345
kWh
-
05 2.4314: Use synthetic lubricant $1,491 $833 $1,491
15,826
kWh
-
06 2.7444: Close holes and openings in building such as broken windows $109 $100 $109
1,465
kWh
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $459 $1,522 $459
6,155
kWh
-
08 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,843 $860 $1,843
4,689
kWh
-
09 2.2122: Install / repair insulation on condensate lines $826 $975 - $826
-
MMBtu
10 2.2136: Install / repair insulation on steam lines $1,668 $554 - $1,668
-
MMBtu
11 2.2441: Preheat boiler makeup water with waste process heat $714 $3,000 - $714
-
MMBtu
TOTAL RECOMMENDED $21,997 $24,973 $18,789
227,725
kWh
$3,208
-
MMBtu
TOTAL IMPLEMENTED $13,889 $8,622 $12,221
139,507
kWh
$1,668
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs