Assessment Year | 1994 |
---|---|
Principal Product | baked bread, pastry |
NAICS |
n/a
|
SIC | 2051: Bread and Other Bakery Products, Except Cookies and Crackers |
Sales Range | $10 M to 50M |
# of Employees | 130 |
Plant Area |
59,942
ft2
|
Annual Production | 8,000
ton
|
Production Hrs. Annual | 8,112
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $202,223 | 2,711,899 |
kWh
|
$0.075 |
Natural Gas | $95,176 | 21,628 |
MMBtu
|
$4.40 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $21,997 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,889 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $7,829 | $4,753 |
$7,829
104,924
kWh
|
- | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $490 | - |
$490
6,448
kWh
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,393 | $12,076 |
$6,393
85,873
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $175 | $300 |
$175
2,345
kWh
|
- | |
05 | 2.4314: Use synthetic lubricant | $1,491 | $833 |
$1,491
15,826
kWh
|
- | |
06 | 2.7444: Close holes and openings in building such as broken windows | $109 | $100 |
$109
1,465
kWh
|
- | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $459 | $1,522 |
$459
6,155
kWh
|
- | |
08 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,843 | $860 |
$1,843
4,689
kWh
|
- | |
09 | 2.2122: Install / repair insulation on condensate lines | $826 | $975 | - |
$826
-
MMBtu
|
|
10 | 2.2136: Install / repair insulation on steam lines | $1,668 | $554 | - |
$1,668
-
MMBtu
|
|
11 | 2.2441: Preheat boiler makeup water with waste process heat | $714 | $3,000 | - |
$714
-
MMBtu
|
|
TOTAL RECOMMENDED | $21,997 | $24,973 |
$18,789
227,725
kWh
|
$3,208
-
MMBtu
|
||
TOTAL IMPLEMENTED | $13,889 | $8,622 |
$12,221
139,507
kWh
|
$1,668
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs