ITAC Assessment: LE0130
ITAC logo
ITAC Assessment: LE0130
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Automobile Bearings
NAICS
n/a
SIC 3462: Iron and Steel Forgings
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 268,000
ft2
Annual Production 3,126,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $757,404 16,880,946
kWh
Electricity Demand $223,035 35,426
kW-mo/yr
Natural Gas $450,560 57,490
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $147,149 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,506

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 2.7135: Install occupancy sensors $5,934 $150 $5,027
100,740
kWh
$907
-
kW-mo/yr
- -
02 2.2511: Insulate bare equipment $583 $180 - - $583
-
MMBtu
-
03 3.5316: Contract a wood pallet recycling company $2,040 - - - - $2,040
-
Tgal
04 2.1116: Improve combustion control capability $8,789 $1,000 - - $8,789
-
MMBtu
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $16,677 - $10,567
235,338
kWh
$6,110
-
kW-mo/yr
- -
06 2.4312: Improve lubrication practices $7,373 $400 $7,132
158,832
kWh
$241
-
kW-mo/yr
- -
07 2.7496: Install partitions to reduce size of conditioned space $105,753 $60,000 $57,374
1,277,816
kWh
$48,379
-
kW-mo/yr
- -
TOTAL RECOMMENDED $147,149 $61,730 $80,100
1,772,726
kWh
$55,637
-
kW-mo/yr
$9,372
-
MMBtu
$2,040
-
Tgal
TOTAL IMPLEMENTED $27,506 $1,000 $10,567
235,338
kWh
$6,110
-
kW-mo/yr
$8,789
-
MMBtu
$2,040
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs