Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

190

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Storage battery manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT0988 #06 Y:2024 Use solar heat to make electricty $91,923 $962,674
GT0988 #05 Y:2024 Optimize plant power factor $10,998 $47,093
GT0988 #04 Y:2024 Reduce the pressure of compressed air to the minimum required $598 $200
GT0988 #03 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $18,172 $1,850
GT0988 #02 Y:2024 Chill water to the highest temperature possible $5,947 $400
GT0988 #01 Y:2024 Apply for tax-free status for energy purchases $14,344 $800
CI0036 #07 Y:2024 Replace fossil fuel equipment with electrical equipment $1,361 $8,000
CI0036 #06 Y:2024 Recharge batteries on during off-peak demand periods $6,300 $80
CI0036 #05 Y:2024 Recover waste heat from equipment $36,628 $24,000
CI0036 #04 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $54,033 $1,200
CI0036 #03 Y:2024 Use solar heat to make electricty $101,553 $493,100
CI0036 #02 Y:2024 Replace fossil fuel equipment with electrical equipment $209,556 $50,000
CI0036 #01 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $400,041 $153,000
CI0035 #10 Y:2024 Use photocell controls $3,673 $1,013
CI0035 #09 Y:2024 Use most efficient type of electric motors $4,345 $2,340
CI0035 #08 Y:2024 Install occupancy sensors $4,779 $4,500
CI0035 #07 Y:2024 Recharge batteries on during off-peak demand periods $9,944 $9,750
CI0035 #06 Y:2024 Utilize higher efficiency lamps and/or ballasts $14,387 $20,213
CI0035 #05 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $27,879 $16,500
CI0035 #04 Y:2024 Recover waste heat from equipment $41,839 $6,000