| Assessment Year | 2025 |
|---|---|
| Principal Product | Stationary Batteries |
| NAICS | 335911: Storage Battery Manufacturing |
| SIC | 3691: Storage Batteries |
| Sales Range | $50 M to 100M |
| # of Employees | 180 |
| Plant Area |
300,000
ft2
|
| Annual Production | 48,000
pieces
|
| Production Hrs. Annual | 2,080
hrs
|
| Location (State) | Indiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $597,972 | 11,983,005 |
kWh
|
$0.050 | |
| Electricity Demand | $457,742 | 22,476 |
kW-mo/yr
|
$20.37 | |
| Electricity Fees | $1,898 | - |
|
- | |
| Natural Gas | $378,724 | 73,252 |
MMBtu
|
$5.17 | |
| Waste Disposal Costs | |||||
| Water Usage | $129,670 | 19,266 |
Tgal
|
$6.73 | |
| TOTAL YEARLY COSTS | $1,566,006 | ||||
| RECOMMENDED SAVINGS* | $43,525 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,948 | $83 |
$1,178
23,555
kWh
|
$2,770
-
kW-mo/yr
|
- | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $4,530 | $714 |
$1,352
27,040
kWh
|
$3,178
-
kW-mo/yr
|
- | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $31,184 | $17,042 |
$9,307
186,130
kWh
|
$21,877
-
kW-mo/yr
|
- | |
| 04 | 2.2443: Re-use or recycle hot or cold process exhaust air | $719 | $419 | - | - |
$719
-
MMBtu
|
|
| 05 | 2.7135: Install occupancy sensors | $1,174 | $877 |
$1,174
23,489
kWh
|
- | - | |
| 06 | 2.7231: Use radiant heater for spot heating | $1,970 | $4,748 | - | - |
$1,970
-
MMBtu
|
|
| TOTAL RECOMMENDED | $43,525 | $23,883 |
$13,011
260,214
kWh
|
$27,825
-
kW-mo/yr
|
$2,689
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs