Assessment Year | 1995 |
---|---|
Principal Product | Sheetmetal Fabrications |
NAICS |
n/a
|
SIC | 3444: Sheet Metal Work |
Sales Range | $1 M to 5M |
# of Employees | 30 |
Plant Area |
20,000
ft2
|
Annual Production | 3,000
pieces
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Maine |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $56,344 | 576,495 |
kWh
|
$0.098 |
Fuel Oil #2 | $9,746 | 1,978 |
MMBtu
|
$4.93 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $16,153 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,686 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $10,677 | $4,000 |
$13,023
104,924
kWh
|
$(-2,346.0)
-
MMBtu
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,843 | $9,938 |
$3,843
41,032
kWh
|
- | |
03 | 2.2437: Recover waste heat from equipment | $790 | $870 | - |
$790
-
MMBtu
|
|
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $477 | $400 | - |
$477
-
MMBtu
|
|
05 | 2.4221: Install compressor air intakes in coolest locations | $366 | $300 |
$366
5,275
kWh
|
- | |
TOTAL RECOMMENDED | $16,153 | $15,508 |
$17,232
151,231
kWh
|
$(-1,079.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $4,686 | $10,638 |
$4,209
46,307
kWh
|
$477
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs