Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

173

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Relay and industrial control manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
BD0483 #04 Y:2016 Reduce the pressure of compressed air to the minimum required $3,476 $15
BD0483 #03 Y:2016 Utilize higher efficiency lamps and/or ballasts $4,053 $10,965
BD0483 #02 Y:2016 Use radiant heater for spot heating $4,162 $8,800
BD0483 #01 Y:2016 Insulate bare equipment $7,762 $1,810
SU0390 #10 Y:2015 Conserve energy by efficient use of vending machines $81 $357
SU0390 #09 Y:2015 Utilize higher efficiency lamps and/or ballasts $15,765 $68,288
SU0390 #08 Y:2015 Utilize higher efficiency lamps and/or ballasts $3,953 $15,369
SU0390 #07 Y:2015 Install / repair insulation on steam lines $24 $73
SU0390 #06 Y:2015 Install occupancy sensors $1,011 $1,637
SU0390 #05 Y:2015 Utilize higher efficiency lamps and/or ballasts $478 $586
SU0390 #04 Y:2015 Install compressor air intakes in coolest locations $1,464 $1,320
SU0390 #03 Y:2015 Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $1,702 $1,033
SU0390 #02 Y:2015 Recover waste heat from equipment $1,177 $440
SU0390 #01 Y:2015 Utilize energy-efficient belts and other improved mechanisms $355 -
MZ0162 #05 Y:2014 Use most efficient type of electric motors $560 $2,906
MZ0162 #04 Y:2014 Utilize higher efficiency lamps and/or ballasts $2,287 $16,804
MZ0162 #03 Y:2014 Use or replace with energy efficient substitutes $537 $2,680
MZ0162 #02 Y:2014 Reduce the pressure of compressed air to the minimum required $657 -
MZ0162 #01 Y:2014 Recover waste heat from equipment $1,303 $2,900
UK1315 #09 Y:2013 Optimize plant power factor $4,767 $1,600