Assessment Year | 2013 |
---|---|
Principal Product | Industrial Resistors |
NAICS | 335314: Relay and Industrial Control Manufacturing |
SIC | 3625: Relays and Industrial Controls |
Sales Range | $10 M to 50M |
# of Employees | 110 |
Plant Area |
65,000
ft2
|
Annual Production | 285,400
pieces
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Kentucky |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $64,102 | 1,103,517 |
kWh
|
$0.058 |
Electricity Demand | $28,189 | 3,817 |
kW-mo/yr
|
$7.39 |
Electricity Fees | $14,576 | - |
|
- |
Natural Gas | $11,856 | 1,869 |
MMBtu
|
$6.34 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $40,889 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,195 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,240 | $1,930 |
$974
16,800
kWh
|
$266
-
kW-mo/yr
|
- | - | - | |
02 | 2.4239: Eliminate or reduce compressed air usage | $943 | $2,750 |
$553
9,526
kWh
|
$390
-
kW-mo/yr
|
- | - | - | |
03 | 2.6218: Turn off equipment when not in use | $2,528 | - |
$2,528
43,587
kWh
|
- | - | - | - | |
04 | 2.7241: Install outside air damper / economizer on hvac unit | $633 | - |
$633
10,926
kWh
|
- | - | - | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $261 | - |
$208
3,590
kWh
|
$53
-
kW-mo/yr
|
- | - | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $1,766 | $2,000 |
$446
7,680
kWh
|
$120
-
kW-mo/yr
|
- |
$1,200
-
MMBtu
|
- | |
07 | 2.7232: Replace existing hvac unit with high efficiency model | $26,356 | $52,000 |
$4,054
69,888
kWh
|
$2,302
-
kW-mo/yr
|
- | - | $20,000 | |
08 | 2.7224: Reduce space conditioning during non-working hours | $2,395 | $1,200 |
$1,045
18,021
kWh
|
- | - |
$1,350
-
MMBtu
|
- | |
09 | 2.3212: Optimize plant power factor | $4,767 | $1,600 | - | - | $4,767 | - | - | |
TOTAL RECOMMENDED | $40,889 | $61,480 |
$10,441
180,018
kWh
|
$3,131
-
kW-mo/yr
|
$4,767 |
$2,550
-
MMBtu
|
$20,000 | ||
TOTAL IMPLEMENTED | $11,195 | $5,530 |
$4,789
82,583
kWh
|
$439
-
kW-mo/yr
|
$4,767 |
$1,200
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs