ITAC Assessment: MZ0162
ITAC logo
ITAC Assessment: MZ0162
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product switchgears and electric relay panels
NAICS 335314: Relay and Industrial Control Manufacturing
SIC 3625: Relays and Industrial Controls
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 119,600
ft2
Annual Production 110
pieces
Production Hrs. Annual 4,500
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $158,112 2,535,800
kWh
Electricity Demand $18,646 7,924
kW-mo/yr
LPG $80,400 5,496
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,344 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,824

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings
01 2.2437: Recover waste heat from equipment $1,303 $2,900 - - $1,303
-
MMBtu
02 2.4231: Reduce the pressure of compressed air to the minimum required $657 - $657
10,603
kWh
- -
03 2.4322: Use or replace with energy efficient substitutes $537 $2,680 $537
8,656
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,287 $16,804 $1,884
30,388
kWh
$403
-
kW-mo/yr
-
05 2.4133: Use most efficient type of electric motors $560 $2,906 $509
8,204
kWh
$51
-
kW-mo/yr
-
TOTAL RECOMMENDED $5,344 $25,290 $3,587
57,851
kWh
$454
-
kW-mo/yr
$1,303
-
MMBtu
TOTAL IMPLEMENTED $2,824 $19,484 $2,421
39,044
kWh
$403
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs