Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

761

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Electrical equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MI0453 #05 Y:2024 Install occupancy sensors $4,117 $1,690
MI0453 #04 Y:2024 Use most efficient type of electric motors $8,976 $11,882
MI0453 #03 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $14,219 $14,799
MI0453 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $14,805 $1,620
MI0453 #01 Y:2024 Use distillation, evaporation to remove contaminants $43,981 $80,000
GT0987 #08 Y:2024 Use solar heat to make electricty $67,106 $614,572
GT0987 #07 Y:2024 Install occupancy sensors $339 $875
GT0987 #06 Y:2024 Turn off equipment when not in use $827 $1,740
GT0987 #05 Y:2024 Reduce the pressure of compressed air to the minimum required $2,073 $800
GT0987 #04 Y:2024 Conserve energy by efficient use of vending machines $369 $90
GT0987 #03 Y:2024 Turn off equipment when not in use $7,859 $1,800
GT0987 #02 Y:2024 Eliminate or reduce compressed air usage $1,518 $100
GT0987 #01 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $29,398 $1,850
UL2414 #06 Y:2024 Use outside cold water source as a supply of cooling water $71,333 $21,308
UL2414 #05 Y:2024 Improve air circulation with destratification fans / other methods $3,205 $15,000
UL2414 #04 Y:2024 Reduce space conditioning during non-working hours $3,526 $1,500
UL2414 #03 Y:2024 Use solar heat to make electricty $121,785 $1,075,553
UL2414 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $6,855 $3,045
UL2414 #01 Y:2024 Optimize plant power factor $5,637 $7,818
LS2410 #04 Y:2024 Use solar heat to make electricty $104,382 $480,480