Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Electrical equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT0799 #06 Y:2004 Use / purchase optimum sized compressor $16,500 $60,000
GT0799 #05 Y:2004 Recover waste heat from equipment $29,409 $260,000
GT0799 #04 Y:2004 Use cooling tower or economizer to replace chiller cooling $4,608 $12,000
GT0799 #03 Y:2004 Utilize higher efficiency lamps and/or ballasts $1,040 $280,000
GT0799 #02 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $4,582 $3,682
GT0799 #01 Y:2004 Analyze flue gas for proper air/fuel ratio $6,890 $450
BD0277 #11 Y:2004 Change operating conditions $1,882 -
BD0277 #10 Y:2004 Automate payroll system $4,368 $2,500
BD0277 #09 Y:2004 Install occupancy sensors $395 $525
BD0277 #08 Y:2004 Utilize higher efficiency lamps and/or ballasts $426 $297
BD0277 #07 Y:2004 Shut off pilots in standby equipment $736 -
BD0277 #06 Y:2004 Install compressor air intakes in coolest locations $1,301 $800
BD0277 #05 Y:2004 Reduce the pressure of compressed air to the minimum required $1,482 -
BD0277 #04 Y:2004 Recover waste heat from equipment $1,514 $1,200
BD0277 #03 Y:2004 Use radiant heater for spot heating $2,870 $4,800
BD0277 #02 Y:2004 Utilize higher efficiency lamps and/or ballasts $4,675 $2,008
BD0277 #01 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $7,390 $1,400
IA0346 #08 Y:2004 Utilize higher efficiency lamps and/or ballasts $10,882 $25,488
IA0346 #07 Y:2004 Install occupancy sensors $338 $665
IA0346 #06 Y:2004 Utilize higher efficiency lamps and/or ballasts $736 $3,053