Assessment Year | 2004 |
---|---|
Principal Product | power supplies |
NAICS | 335311: Power, Distribution, and Specialty Transformer Manufacturing |
SIC | 3612: Power, Distribution, and Specialty Transformers |
Sales Range | $10 M to 50M |
# of Employees | 210 |
Plant Area |
99,000
ft2
|
Annual Production | 14,000
pieces
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Minnesota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $102,371 | 3,340,200 |
kWh
|
$0.031 |
Electricity Demand | $50,060 | 10,008 |
kW-mo/yr
|
$5.00 |
Natural Gas | $36,690 | 3,736 |
MMBtu
|
$9.82 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $26,999 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,184 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $375 | $227 |
$280
9,196
kWh
|
$135
-
kW-mo/yr
|
- | $(-40.0) | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $581 | $20 |
$395
12,896
kWh
|
$186
-
kW-mo/yr
|
- | - | |
03 | 2.4226: Use / purchase optimum sized compressor | $3,933 | $5,520 |
$2,673
87,360
kWh
|
$1,260
-
kW-mo/yr
|
- | - | |
04 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $7,993 | $6,000 |
$306
10,000
kWh
|
$352
-
kW-mo/yr
|
$7,335
-
MMBtu
|
- | |
05 | 2.7444: Close holes and openings in building such as broken windows | $2,161 | $2,400 |
$188
6,140
kWh
|
$184
-
kW-mo/yr
|
$1,789
-
MMBtu
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $736 | $3,053 |
$467
15,216
kWh
|
$269
-
kW-mo/yr
|
- | - | |
07 | 2.7135: Install occupancy sensors | $338 | $665 |
$338
11,081
kWh
|
- | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,882 | $25,488 |
$7,396
241,696
kWh
|
$3,486
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $26,999 | $43,373 |
$12,043
393,585
kWh
|
$5,872
-
kW-mo/yr
|
$9,124
-
MMBtu
|
$(-40.0) | ||
TOTAL IMPLEMENTED | $12,184 | $12,365 |
$1,974
64,529
kWh
|
$1,126
-
kW-mo/yr
|
$9,124
-
MMBtu
|
$(-40.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs