ITAC Assessment: IA0346
ITAC logo
ITAC Assessment: IA0346
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product power supplies
NAICS 335311: Power, Distribution, and Specialty Transformer Manufacturing
SIC 3612: Power, Distribution, and Specialty Transformers
Sales Range $10
M
to 50
M
# of Employees 210
Plant Area 99,000
ft2
Annual Production 14,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $102,371 3,340,200
kWh
Electricity Demand $50,060 10,008
kW-mo/yr
Natural Gas $36,690 3,736
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,999 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,184

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $375 $227 $280
9,196
kWh
$135
-
kW-mo/yr
- $(-40.0)
02 2.4231: Reduce the pressure of compressed air to the minimum required $581 $20 $395
12,896
kWh
$186
-
kW-mo/yr
- -
03 2.4226: Use / purchase optimum sized compressor $3,933 $5,520 $2,673
87,360
kWh
$1,260
-
kW-mo/yr
- -
04 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $7,993 $6,000 $306
10,000
kWh
$352
-
kW-mo/yr
$7,335
-
MMBtu
-
05 2.7444: Close holes and openings in building such as broken windows $2,161 $2,400 $188
6,140
kWh
$184
-
kW-mo/yr
$1,789
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $736 $3,053 $467
15,216
kWh
$269
-
kW-mo/yr
- -
07 2.7135: Install occupancy sensors $338 $665 $338
11,081
kWh
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $10,882 $25,488 $7,396
241,696
kWh
$3,486
-
kW-mo/yr
- -
TOTAL RECOMMENDED $26,999 $43,373 $12,043
393,585
kWh
$5,872
-
kW-mo/yr
$9,124
-
MMBtu
$(-40.0)
TOTAL IMPLEMENTED $12,184 $12,365 $1,974
64,529
kWh
$1,126
-
kW-mo/yr
$9,124
-
MMBtu
$(-40.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs