Assessment Year | 2012 |
---|---|
Principal Product | Metal Fabrication |
NAICS | 332119: Metal Crown, Closure, and Other Metal Stamping (except Automotive) |
SIC | 3469: Metal Stampings, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 45 |
Plant Area |
53,000
ft2
|
Annual Production | 10,000,000
pieces
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $93,318 | 1,813,728 |
kWh
|
$0.051 |
Electricity Demand | $59,663 | 4,548 |
kW-mo/yr
|
$13.12 |
Natural Gas | $4,827 | 521 |
MMBtu
|
$9.26 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $12,259 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,016 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,297 | $12,425 |
$3,928
79,107
kWh
|
$3,313
-
kW-mo/yr
|
$56 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,138 | $3,850 |
$1,152
23,190
kWh
|
$971
-
kW-mo/yr
|
$15 | |
03 | 2.4239: Eliminate or reduce compressed air usage | $1,006 | $500 |
$546
10,986
kWh
|
$460
-
kW-mo/yr
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,010 | $1,000 |
$548
11,041
kWh
|
$462
-
kW-mo/yr
|
- | |
05 | 2.4239: Eliminate or reduce compressed air usage | $399 | $300 |
$216
4,359
kWh
|
$183
-
kW-mo/yr
|
- | |
06 | 2.7224: Reduce space conditioning during non-working hours | $409 | $360 |
$409
8,244
kWh
|
- | - | |
TOTAL RECOMMENDED | $12,259 | $18,435 |
$6,799
136,927
kWh
|
$5,389
-
kW-mo/yr
|
$71 | ||
TOTAL IMPLEMENTED | $2,016 | $1,500 |
$1,094
22,027
kWh
|
$922
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs