Assessment Year | 1991 |
---|---|
Principal Product | LIGHT BULBS |
NAICS |
n/a
|
SIC | 3641: Electric Lamp Bulbs and Tubes |
Sales Range | $50 M to 100M |
# of Employees | 200 |
Plant Area |
n/a
|
Annual Production | 9,000,000
pieces
|
Production Hrs. Annual | 2,083
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $543,228 | 6,748,242 |
kWh
|
$0.080 |
Natural Gas | $399,329 | 82,295 |
MMBtu
|
$4.85 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $87,754 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $933 | - |
$933
11,723
kWh
|
- | |
02 | 2.4221: Install compressor air intakes in coolest locations | $1,833 | $407 |
$1,833
22,860
kWh
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,432 | $200 |
$1,432
17,878
kWh
|
- | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $5,159 | $500 | - |
$5,159
-
MMBtu
|
|
05 | 2.2122: Install / repair insulation on condensate lines | $217 | $59 | - |
$217
-
MMBtu
|
|
06 | 2.8113: Purchase gas directly from a contract gas supplier | $78,180 | - | - |
$78,180
-
MMBtu
|
|
TOTAL RECOMMENDED | $87,754 | $1,166 |
$4,198
52,461
kWh
|
$83,556
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs