ITAC Assessment: RU0107
ITAC logo
ITAC Assessment: RU0107
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product LIGHT BULBS
NAICS
n/a
SIC 3641: Electric Lamp Bulbs and Tubes
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area
n/a
Annual Production 9,000,000
pieces
Production Hrs. Annual 2,083
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $543,228 6,748,242
kWh
Natural Gas $399,329 82,295
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $87,754 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $933 - $933
11,723
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $1,833 $407 $1,833
22,860
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,432 $200 $1,432
17,878
kWh
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $5,159 $500 - $5,159
-
MMBtu
05 2.2122: Install / repair insulation on condensate lines $217 $59 - $217
-
MMBtu
06 2.8113: Purchase gas directly from a contract gas supplier $78,180 - - $78,180
-
MMBtu
TOTAL RECOMMENDED $87,754 $1,166 $4,198
52,461
kWh
$83,556
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs