64
matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
DL0261 #06 Y:2025 | 06 | 2025 | Use optimum size and capacity equipment | $4,283 | $1,200 |
n/a
|
DL0261 #05 Y:2025 | 05 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $14,186 | $16,400 |
n/a
|
DL0261 #04 Y:2025 | 04 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $15,337 | $90,000 |
n/a
|
DL0261 #03 Y:2025 | 03 | 2025 | Change procedures / equipment / operating conditions | $9,021 | $7,950 |
n/a
|
DL0261 #02 Y:2025 | 02 | 2025 | Utilize controls to operate equipment only when needed | $4,374 | - |
n/a
|
DL0261 #01 Y:2025 | 01 | 2025 | Turn off equipment when not in use | $5,489 | $720 |
n/a
|
TT0298 #13 Y:2023 | 13 | 2023 | Recover waste heat from equipment | $3,689 | $9,000 | |
TT0298 #12 Y:2023 | 12 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,575 | $2,010 | |
TT0298 #11 Y:2023 | 11 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $5,983 | $9,000 | |
TT0298 #10 Y:2023 | 10 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $7,044 | $13,500 | |
TT0298 #09 Y:2023 | 09 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $7,862 | $9,000 | |
TT0298 #08 Y:2023 | 08 | 2023 | Reduce the pressure of compressed air to the minimum required | $9,325 | $22,800 | |
TT0298 #07 Y:2023 | 07 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $12,545 | $31,800 | |
TT0298 #06 Y:2023 | 06 | 2023 | Adopt in-house material generation | $20,290 | $61,440 | |
TT0298 #05 Y:2023 | 05 | 2023 | Isolate hot or cold equipment | $25,424 | $60,000 | |
TT0298 #04 Y:2023 | 04 | 2023 | Insulate bare equipment | $26,094 | $85,000 | |
TT0298 #03 Y:2023 | 03 | 2023 | Use / purchase optimum sized compressor | $26,893 | $45,000 | |
TT0298 #02 Y:2023 | 02 | 2023 | Use solar heat to make electricty | $32,300 | $196,225 | |
TT0298 #01 Y:2023 | 01 | 2023 | Minimize water usage | $54,343 | $42,000 | |
TT0297 #08 Y:2023 | 08 | 2023 | Turn off equipment when not in use | $735 | $750 |