ITAC Assessment: TT0297
ITAC logo
ITAC Assessment: TT0297
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Light-Duty Water Heaters
NAICS 335228: Other Major Household Appliance Manufacturing
SIC 3639: Household Appliances, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 988
Plant Area 539,000
ft2
Annual Production 1,612,000
units
Production Hrs. Annual 3,968
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,282,456 20,783,949
kWh
Electricity Demand $651,783 45,853
kW-mo/yr
Natural Gas $1,466,581 247,651
MMBtu
Waste Disposal Costs
Water Usage $91,006 8,584
Tgal
TOTAL YEARLY COSTS $3,491,826
RECOMMENDED SAVINGS* $93,192 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Usage Savings
01 2.9114: Use solar heat to make electricty $49,703 $203,650 $49,703
805,540
kWh
- - -
02 2.4239: Eliminate or reduce compressed air usage $13,890 $1,250 $13,890
225,124
kWh
- - -
03 2.7135: Install occupancy sensors $11,161 $14,500 $11,161
180,900
kWh
- - -
04 2.3212: Optimize plant power factor $8,533 $20,000 - - $8,533 -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,428 $1,950 $5,428
87,970
kWh
- - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,512 $6,000 $1,553
25,178
kWh
$959
-
kW-mo/yr
- -
07 3.5132: Reuse rich white water in other applications $1,230 $1,820 - - - $1,230
-
Tgal
08 2.6218: Turn off equipment when not in use $735 $750 $621
10,058
kWh
$114
-
kW-mo/yr
- -
TOTAL RECOMMENDED $93,192 $249,920 $82,356
1,334,770
kWh
$1,073
-
kW-mo/yr
$8,533 $1,230
-
Tgal
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs