Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

44

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Small electrical appliance manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WM0045 #11 Y:2014 Eliminate leaks in inert gas and compressed air lines/ valves $1,255 $1,220
WM0045 #10 Y:2014 Install / repair insulation on steam lines $38 $100
WM0045 #09 Y:2014 Cover open tanks $51 -
WM0045 #08 Y:2014 Utilize energy-efficient belts and other improved mechanisms $313 $630
WM0045 #07 Y:2014 Reduce illumination to minimum necessary levels $478 $280
WM0045 #06 Y:2014 Improve space comfort conditioning $4,160 $350
WM0045 #05 Y:2014 Insulate glazing, walls, ceilings, and roofs $1,440 $940
WM0045 #04 Y:2014 Analyze flue gas for proper air/fuel ratio $1,111 $2,030
WM0045 #03 Y:2014 Upgrade controls on compressors $2,701 -
WM0045 #02 Y:2014 Eliminate or reduce compressed air usage $2,114 $2,500
WM0045 #01 Y:2014 Recycle white water $6,827 $13,958
NC0449 #06 Y:2012 Install compressor air intakes in coolest locations $1,521 $3,200
NC0449 #05 Y:2012 Use adjustable frequency drive or multiple speed motors on existing system $1,027 $6,500
NC0449 #04 Y:2012 Recover waste heat from equipment $7,288 $37,820
NC0449 #03 Y:2012 Utilize higher efficiency lamps and/or ballasts $3,300 $10,168
NC0449 #02 Y:2012 Utilize higher efficiency lamps and/or ballasts $883 $1,560
NC0449 #01 Y:2012 Use adjustable frequency drive or multiple speed motors on existing system $39,096 $50,000
TT0071 #07 Y:2011 Upgrade controls on compressors $4,400 $9,000
TT0071 #06 Y:2011 Recover waste heat from equipment $4,600 $3,000
TT0071 #05 Y:2011 Eliminate leaks in inert gas and compressed air lines/ valves $10,900 $5,000