Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

108

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Household appliance manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TT0297 #07 Y:2023 Reuse rich white water in other applications $1,230 $1,820
TT0297 #06 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $2,512 $6,000
TT0297 #05 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $5,428 $1,950
TT0297 #04 Y:2023 Optimize plant power factor $8,533 $20,000
TT0297 #03 Y:2023 Install occupancy sensors $11,161 $14,500
TT0297 #02 Y:2023 Eliminate or reduce compressed air usage $13,890 $1,250
TT0297 #01 Y:2023 Use solar heat to make electricty $49,703 $203,650
UD1026 #06 Y:2021 Chill water to the highest temperature possible $817 -
UD1026 #05 Y:2021 Utilize a less expensive cooling method $42,343 $88,894
UD1026 #04 Y:2021 Use cooling tower or economizer to replace chiller cooling $441,982 $200,000
UD1026 #03 Y:2021 Reduce space conditioning during non-working hours $58,812 $45,000
UD1026 #02 Y:2021 Install outside air damper / economizer on hvac unit $174,302 $45,000
UD1026 #01 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $4,601 -
TT0233 #07 Y:2019 Insulate bare equipment $565 $1,450
TT0233 #06 Y:2019 Analyze flue gas for proper air/fuel ratio $3,658 $2,000
TT0233 #05 Y:2019 Use waste heat from hot flue gases to preheat $6,206 $22,392
TT0233 #04 Y:2019 Turn off equipment during breaks, reduce operating time $12,859 $20
TT0233 #03 Y:2019 Optimize plant power factor $43,091 $147,540
TT0233 #02 Y:2019 Meter waste water $52,049 $2,000
TT0233 #01 Y:2019 Use adjustable frequency drive or multiple speed motors on existing system $57,084 $30,000