Assessment Year | 2020 |
---|---|
Principal Product | Cooking Appliances |
NAICS | 335228: Other Major Household Appliance Manufacturing |
SIC | 3639: Household Appliances, Not Elsewhere Classified |
Sales Range | greater than $500 M |
# of Employees | 1,350 |
Plant Area |
1,000,000
ft2
|
Annual Production | 740,671
units
|
Production Hrs. Annual | 4,080
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $1,069,433 | 32,458,425 |
kWh
|
$0.033 | |
Electricity Demand | $870,299 | 138,082 |
kW-mo/yr
|
$6.30 | |
Natural Gas | $688,586 | 156,111 |
MMBtu
|
$4.41 | |
Waste Disposal Costs | |||||
Water Usage | $93,500 | 31,030 |
Tgal
|
$3.01 | |
Water Disposal | $147,503 | 31,030 |
Tgal
|
$4.75 | |
TOTAL YEARLY COSTS | $2,869,321 | ||||
RECOMMENDED SAVINGS* | $175,512 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $168,741 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $57,084 | $30,000 |
$57,084
1,735,076
kWh
|
- | - | - | |
02 | 3.4155: Meter waste water | $52,049 | $2,000 | - | - | - |
$52,049
-
Tgal
|
|
03 | 2.3212: Optimize plant power factor | $43,091 | $147,540 | - |
$43,091
-
kW-mo/yr
|
- | - | |
04 | 2.6212: Turn off equipment during breaks, reduce operating time | $12,859 | $20 |
$12,859
390,844
kWh
|
- | - | - | |
05 | 2.2414: Use waste heat from hot flue gases to preheat | $6,206 | $22,392 | - | - |
$6,206
-
MMBtu
|
- | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,658 | $2,000 | - | - |
$3,658
-
MMBtu
|
- | |
07 | 2.2511: Insulate bare equipment | $565 | $1,450 | - | - |
$565
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $175,512 | $205,402 |
$69,943
2,125,920
kWh
|
$43,091
-
kW-mo/yr
|
$10,429
-
MMBtu
|
$52,049
-
Tgal
|
||
TOTAL IMPLEMENTED | $168,741 | $181,560 |
$69,943
2,125,920
kWh
|
$43,091
-
kW-mo/yr
|
$3,658
-
MMBtu
|
$52,049
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs