Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

86

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Electrical equipment, appliance, and component manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WI0517 #02 Y:2006 Reduce hot water temperature to the minimum required $25,159 $4,500
WI0517 #01 Y:2006 Reschedule plant operations or reduce load to avoid peaks $27,918 $6,000
WI0489 #10 Y:2004 Turn off equipment when not in use $206 -
WI0489 #09 Y:2004 Install occupancy sensors $481 $100
WI0489 #08 Y:2004 Maintain air filters by cleaning or replacement $815 -
WI0489 #07 Y:2004 Improve lubrication practices $735 $828
WI0489 #06 Y:2004 Reduce the pressure of compressed air to the minimum required $782 -
WI0489 #05 Y:2004 Eliminate or reduce compressed air usage $1,494 $2,314
WI0489 #04 Y:2004 Modify refrigeration system to operate at a lower pressure $3,606 $3,000
WI0489 #03 Y:2004 Utilize energy-efficient belts and other improved mechanisms $4,677 $758
WI0489 #02 Y:2004 Use a less expensive method of waste removal $6,360 -
WI0489 #01 Y:2004 Install timers and/or thermostats $8,655 $1,600
WI0462 #08 Y:2003 Utilize energy-efficient belts and other improved mechanisms $369 $438
WI0462 #07 Y:2003 Install compressor air intakes in coolest locations $798 $840
WI0462 #06 Y:2003 Upgrade controls on compressors $808 $2,500
WI0462 #05 Y:2003 Analyze flue gas for proper air/fuel ratio $2,319 $500
WI0462 #04 Y:2003 Recharge batteries on during off-peak demand periods $4,136 $1,800
WI0462 #03 Y:2003 Reschedule plant operations or reduce load to avoid peaks $3,916 $8,000
WI0462 #02 Y:2003 Replace hydraulic / pneumatic equipment with electric equipment $8,389 $14,000
WI0462 #01 Y:2003 Use closed cycle process to minimize waste water production $30,420 $36,000