Assessment Year | 2006 |
---|---|
Principal Product | Storage batteries |
NAICS | 335911: Storage Battery Manufacturing |
SIC | 3691: Storage Batteries |
Sales Range | less than $500 k |
# of Employees | 350 |
Plant Area |
350,000
ft2
|
Annual Production | 750,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $785,301 | 26,186,204 |
kWh
|
$0.030 |
Electricity Demand | $539,188 | 54,744 |
kW-mo/yr
|
$9.85 |
Natural Gas | $1,022,453 | 109,635 |
MMBtu
|
$9.33 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $94,361 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $21,712 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $27,918 | $6,000 | - |
$27,918
-
kW-mo/yr
|
- | |
02 | 2.6121: Reduce hot water temperature to the minimum required | $25,159 | $4,500 | - | - |
$25,159
-
MMBtu
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $16,406 | $37,744 |
$9,904
314,424
kWh
|
$6,502
-
kW-mo/yr
|
- | |
04 | 2.2628: Utilize a less expensive cooling method | $9,970 | $14,000 |
$9,970
158,265
kWh
|
- | - | |
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $5,306 | $500 | - | - |
$5,306
-
MMBtu
|
|
06 | 2.3132: Recharge batteries on during off-peak demand periods | $4,872 | $2,000 | - |
$4,872
-
kW-mo/yr
|
- | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,730 | $5,500 |
$2,855
90,639
kWh
|
$1,875
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $94,361 | $70,244 |
$22,729
563,328
kWh
|
$41,167
-
kW-mo/yr
|
$30,465
-
MMBtu
|
||
TOTAL IMPLEMENTED | $21,712 | $38,244 |
$9,904
314,424
kWh
|
$6,502
-
kW-mo/yr
|
$5,306
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs