76
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WV0514 #09 Y:2015 | 09 | 2015 | Eliminate or reduce compressed air usage | $530 | $2,104 | |
| WV0514 #08 Y:2015 | 08 | 2015 | Reduce the pressure of compressed air to the minimum required | $842 | $50 | |
| WV0514 #07 Y:2015 | 07 | 2015 | Develop a repair/replace policy | $1,005 | $256 | |
| WV0514 #06 Y:2015 | 06 | 2015 | Utilize energy-efficient belts and other improved mechanisms | $1,663 | - | |
| WV0514 #05 Y:2015 | 05 | 2015 | Install occupancy sensors | $1,756 | $420 | |
| WV0514 #04 Y:2015 | 04 | 2015 | Utilize higher efficiency lamps and/or ballasts | $3,801 | $15,300 | |
| WV0514 #03 Y:2015 | 03 | 2015 | Upgrade controls on compressors | $3,646 | $5,000 | |
| WV0514 #02 Y:2015 | 02 | 2015 | Use or replace with energy efficient substitutes | $4,286 | $11,500 | |
| WV0514 #01 Y:2015 | 01 | 2015 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,361 | $688 | |
| UD0848 #10 Y:2011 | 10 | 2011 | Reduce space conditioning during non-working hours | $834 | $600 | |
| UD0848 #09 Y:2011 | 09 | 2011 | Reduce ventilation air | $882 | $300 | |
| UD0848 #08 Y:2011 | 08 | 2011 | Recover waste heat from equipment | $2,209 | $1,000 | |
| UD0848 #07 Y:2011 | 07 | 2011 | Replace existing hvac unit with high efficiency model | $13,543 | - | |
| UD0848 #06 Y:2011 | 06 | 2011 | Utilize a less expensive cooling method | $3,962 | $1,000 | |
| UD0848 #05 Y:2011 | 05 | 2011 | Eliminate or reduce compressed air usage | $239 | - | |
| UD0848 #04 Y:2011 | 04 | 2011 | Turn off equipment during breaks, reduce operating time | $1,458 | - | |
| UD0848 #03 Y:2011 | 03 | 2011 | Minimize water usage | $1,496 | $1,000 | |
| UD0848 #02 Y:2011 | 02 | 2011 | Turn off equipment when not in use | $6,519 | $5,000 | |
| UD0848 #01 Y:2011 | 01 | 2011 | Meter recycled water (to reduce sewer charges) | $550 | $1,000 | |
| UD0712 #11 Y:2004 | 11 | 2004 | Turn off equipment during breaks, reduce operating time | $259 | $1,000 |