ITAC Assessment: UD0848
ITAC logo
ITAC Assessment: UD0848
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Contactors/Relays
NAICS 335313: Switchgear and Switchboard Apparatus Manufacturing
SIC 3613: Switchgear and Switchboard Apparatus
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 70,000
ft2
Annual Production 70,000
units
Production Hrs. Annual 4,800
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $98,436 1,201,600
kWh
Electricity Demand $10,531 3,708
kW-mo/yr
Natural Gas $29,047 3,570
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,692 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,944

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Water Consumption Savings
01 3.4116: Meter recycled water (to reduce sewer charges) $550 $1,000 - - - $550
-
Tgal
-
02 2.6218: Turn off equipment when not in use $6,519 $5,000 $6,519
91,823
kWh
- - - -
03 3.4151: Minimize water usage $1,496 $1,000 - - - $766
-
Tgal
$730
-
Tgal
04 2.6212: Turn off equipment during breaks, reduce operating time $1,458 - $1,458
20,480
kWh
- - - -
05 2.4239: Eliminate or reduce compressed air usage $239 - $211
2,962
kWh
$28
-
kW-mo/yr
- - -
06 2.2628: Utilize a less expensive cooling method $3,962 $1,000 - - - $2,029
-
Tgal
$1,933
-
Tgal
07 2.7232: Replace existing hvac unit with high efficiency model $13,543 - $5,672
79,563
kWh
$431
-
kW-mo/yr
$7,440
-
MMBtu
- -
08 2.2437: Recover waste heat from equipment $2,209 $1,000 - - $2,209
-
MMBtu
- -
09 2.7314: Reduce ventilation air $882 $300 $223
3,133
kWh
$13
-
kW-mo/yr
$646
-
MMBtu
- -
10 2.7224: Reduce space conditioning during non-working hours $834 $600 $834
11,654
kWh
- - - -
TOTAL RECOMMENDED $31,692 $9,900 $14,917
209,615
kWh
$472
-
kW-mo/yr
$10,295
-
MMBtu
$3,345
-
Tgal
$2,663
-
Tgal
TOTAL IMPLEMENTED $20,944 $5,300 $12,414
174,519
kWh
$444
-
kW-mo/yr
$8,086
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs