ITAC Assessment: UD0458
ITAC logo
ITAC Assessment: UD0458
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product auto brake calipers
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 260
Plant Area 114,000
ft2
Annual Production 2,900,000
pieces
Production Hrs. Annual 7,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $509,034 9,926,143
kWh
Natural Gas $85,525 16,134
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $90,437 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $65,988

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
01 2.3212: Optimize plant power factor $11,292 $25,000 $11,292
-
kWh
- - -
02 2.8113: Purchase gas directly from a contract gas supplier $22,105 $70,000 - - - $22,105
03 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $23,747 $5,000 $23,747
593,200
kWh
- - -
04 2.2437: Recover waste heat from equipment $12,040 $30,000 - $12,040
-
MMBtu
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $11,553 $23,127 $11,553
242,966
kWh
- - -
06 2.7123: Keep lamps and reflectors clean $2,914 $1,680 $2,914
67,702
kWh
- - -
07 2.7111: Reduce illumination to minimum necessary levels $2,344 - $2,344
111,665
kWh
- - -
08 3.4116: Meter recycled water (to reduce sewer charges) $4,442 $600 - - $4,442
-
Tgal
-
TOTAL RECOMMENDED $90,437 $155,407 $51,850
1,015,533
kWh
$12,040
-
MMBtu
$4,442
-
Tgal
$22,105
TOTAL IMPLEMENTED $65,988 $85,407 $49,506
903,868
kWh
$12,040
-
MMBtu
$4,442
-
Tgal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs