Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,320

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Electrical equipment, appliance, and component manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0700 #09 Y:2026 Reduce the pressure of compressed air to the minimum required $496 $600
WV0700 #08 Y:2026 Eliminate or reduce compressed air usage $797 $1,958
WV0700 #07 Y:2026 Upgrade controls on compressors $1,012 $3,260
WV0700 #06 Y:2026 Utilize energy-efficient belts and other improved mechanisms $1,452 $3,984
WV0700 #05 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $3,297 $700
WV0700 #04 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $4,922 $441
WV0700 #03 Y:2026 Install occupancy sensors $6,781 $4,160
WV0700 #02 Y:2026 Reschedule plant operations or reduce load to avoid peaks $6,816 $7,000
WV0700 #01 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $22,299 $86,100
SF0651 #06 Y:2026 Reschedule and rearrange multiple-source heating systems $8,542 $50,720
SF0651 #05 Y:2026 Install occupancy sensors $860 $2,740
SF0651 #04 Y:2026 Reduce space conditioning during non-working hours $13,854 $29,876
SF0651 #03 Y:2026 Recharge batteries on during off-peak demand periods $2,835 $4,194
SF0651 #02 Y:2026 Reduce the pressure of compressed air to the minimum required $496 $160
SF0651 #01 Y:2026 Reduce space conditioning during non-working hours $31,834 $2,250
SU0591 #09 Y:2026 Convert to indirect temperature control system $8,490 $75,000
SU0591 #08 Y:2026 Insulate glazing, walls, ceilings, and roofs $480 $1,980
SU0591 #07 Y:2026 Install vinyl strip / high speed / air curtain doors $963 $2,290
SU0591 #06 Y:2026 Clean or color roof to reduce solar load $3,991 $8,000
SU0591 #05 Y:2026 Conserve energy by efficient use of vending machines $699 $561