Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,077

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Navigational, measuring, electromedical, and control instruments manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0611 #24 Y:2026 Use solar heat to make electricty $55,163 $708,480
SU0611 #23 Y:2026 Install occupancy sensors $237 $2,676
SU0611 #22 Y:2026 Improve air circulation with destratification fans / other methods $4,217 $38,439
SU0611 #21 Y:2026 Reduce ventilation air $3,156 $18,926
SU0611 #20 Y:2026 Install spectral reflectors / delamp $1,833 $8,422
SU0611 #19 Y:2026 Conserve energy by efficient use of vending machines $594 $2,580
SU0611 #18 Y:2026 Keep doors and windows shut when not on use $1,141 $3,634
SU0611 #17 Y:2026 Recover waste heat from equipment $32,253 $100,000
SU0611 #16 Y:2026 Install / repair insulation on steam lines $2,235 $6,878
SU0611 #15 Y:2026 Install vinyl strip / high speed / air curtain doors $716 $1,753
SU0611 #14 Y:2026 Utilize higher efficiency lamps and/or ballasts $7,680 $17,843
SU0611 #13 Y:2026 Develop standard procedures to improve internal yields $35,913 $82,683
SU0611 #12 Y:2026 Convert to indirect temperature control system $79,614 $178,375
SU0611 #11 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $21,022 $34,904
SU0611 #10 Y:2026 Install vinyl strip / high speed / air curtain doors $2,248 $2,502
SU0611 #09 Y:2026 Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $16,881 $2,012
SU0611 #08 Y:2026 Eliminate/reduce an operation $48,642 -
SU0611 #07 Y:2026 Hire energy manager $110,333 -
SU0611 #06 Y:2026 Reschedule plant operations or reduce load to avoid peaks $77,089 -
SU0611 #05 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $2,936 -