1,077
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| SU0611 #24 Y:2026 | 24 | 2026 | Use solar heat to make electricty | $55,163 | $708,480 |
n/a
|
| SU0611 #23 Y:2026 | 23 | 2026 | Install occupancy sensors | $237 | $2,676 |
n/a
|
| SU0611 #22 Y:2026 | 22 | 2026 | Improve air circulation with destratification fans / other methods | $4,217 | $38,439 |
n/a
|
| SU0611 #21 Y:2026 | 21 | 2026 | Reduce ventilation air | $3,156 | $18,926 |
n/a
|
| SU0611 #20 Y:2026 | 20 | 2026 | Install spectral reflectors / delamp | $1,833 | $8,422 |
n/a
|
| SU0611 #19 Y:2026 | 19 | 2026 | Conserve energy by efficient use of vending machines | $594 | $2,580 |
n/a
|
| SU0611 #18 Y:2026 | 18 | 2026 | Keep doors and windows shut when not on use | $1,141 | $3,634 |
n/a
|
| SU0611 #17 Y:2026 | 17 | 2026 | Recover waste heat from equipment | $32,253 | $100,000 |
n/a
|
| SU0611 #16 Y:2026 | 16 | 2026 | Install / repair insulation on steam lines | $2,235 | $6,878 |
n/a
|
| SU0611 #15 Y:2026 | 15 | 2026 | Install vinyl strip / high speed / air curtain doors | $716 | $1,753 |
n/a
|
| SU0611 #14 Y:2026 | 14 | 2026 | Utilize higher efficiency lamps and/or ballasts | $7,680 | $17,843 |
n/a
|
| SU0611 #13 Y:2026 | 13 | 2026 | Develop standard procedures to improve internal yields | $35,913 | $82,683 |
n/a
|
| SU0611 #12 Y:2026 | 12 | 2026 | Convert to indirect temperature control system | $79,614 | $178,375 |
n/a
|
| SU0611 #11 Y:2026 | 11 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $21,022 | $34,904 |
n/a
|
| SU0611 #10 Y:2026 | 10 | 2026 | Install vinyl strip / high speed / air curtain doors | $2,248 | $2,502 |
n/a
|
| SU0611 #09 Y:2026 | 09 | 2026 | Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings | $16,881 | $2,012 |
n/a
|
| SU0611 #08 Y:2026 | 08 | 2026 | Eliminate/reduce an operation | $48,642 | - |
n/a
|
| SU0611 #07 Y:2026 | 07 | 2026 | Hire energy manager | $110,333 | - |
n/a
|
| SU0611 #06 Y:2026 | 06 | 2026 | Reschedule plant operations or reduce load to avoid peaks | $77,089 | - |
n/a
|
| SU0611 #05 Y:2026 | 05 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,936 | - |
n/a
|