Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Research
NAICS 334516: Analytical Laboratory Instrument Manufacturing
SIC 3674: Semiconductors and Related Devices
Sales Range less than $500
k
# of Employees 35
Plant Area 75,000
ft2
Annual Production 1,000
units
Production Hrs. Annual 3,380
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $208,107 2,369,171
kWh
Natural Gas $32,990 3,875
MMBtu
TOTAL YEARLY COSTS $241,097
RECOMMENDED SAVINGS* $9,099 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,192 $35,497 $5,192
59,109
kWh
-
02 2.7135: Install occupancy sensors $52 $250 $52
591
kWh
-
03 2.2511: Insulate bare equipment $1,025 $2,274 $1,025
11,665
kWh
-
04 2.7314: Reduce ventilation air $2,830 $5,000 $2,367
26,950
kWh
$463
-
MMBtu
TOTAL RECOMMENDED $9,099 $43,021 $8,636
98,315
kWh
$463
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs