ITAC Assessment: DS0082
ITAC logo
ITAC Assessment: DS0082
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Specialized Tools and Heavy Equipment
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 700
Plant Area 316,343
ft2
Annual Production 1,500,000
pieces
Production Hrs. Annual 5,200
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $233,235 9,587,632
kWh
Electricity Demand $277,614 23,400
kW-mo/yr
Electricity Fees $14,154 -
Natural Gas $112,121 50,254
MMBtu
LPG $43,351 7,576
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,209 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,882

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $15,969 $44,572 $7,558
315,064
kWh
$8,411
-
kW-mo/yr
- - - - - -
02 2.4221: Install compressor air intakes in coolest locations $1,402 $1,260 $719
29,894
kWh
$683
-
kW-mo/yr
- - - - - -
03 2.2511: Insulate bare equipment $2,060 $1,230 - - $2,060
-
MMBtu
- - - - -
04 3.4151: Minimize water usage $2,363 $2,200 - - - - - - - $2,363
-
Tgal
05 3.8142: Distill contaminated solvents for reuse $1,373 $1,500 $(-48.0)
(-2,052)
kWh
$(-534.0)
-
kW-mo/yr
- $371
-
gal
- - $1,584 -
06 3.1175: Use a different or recycled raw material $2,552 - - - - - - $2,552 - -
07 4.515: Install shelves / racks to utilize unused space $29,490 $10,700 - - - - $29,490 - - -
TOTAL RECOMMENDED $55,209 $61,462 $8,229
342,906
kWh
$8,560
-
kW-mo/yr
$2,060
-
MMBtu
$371
-
gal
$29,490 $2,552 $1,584 $2,363
-
Tgal
TOTAL IMPLEMENTED $49,882 $58,702 $7,558
315,064
kWh
$8,411
-
kW-mo/yr
$2,060
-
MMBtu
- $29,490 - - $2,363
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs