16
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Printed circuit assembly (electronic assembly) manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| MA0715 #06 Y:2013 | 06 | 2013 | Reduce the pressure of compressed air to the minimum required | $133 | $100 | |
| MA0715 #05 Y:2013 | 05 | 2013 | Eliminate leaks in inert gas and compressed air lines/ valves | $599 | $600 | |
| MA0715 #04 Y:2013 | 04 | 2013 | Reduce ventilation air | $738 | $1,638 | |
| MA0715 #03 Y:2013 | 03 | 2013 | Apply for tax-free status for energy purchases | $889 | $200 | |
| MA0715 #02 Y:2013 | 02 | 2013 | Reduce ventilation air | $1,256 | $1,795 | |
| MA0715 #01 Y:2013 | 01 | 2013 | Burn a less expensive grade of fuel | $4,116 | $500 | |
| MAS028 #05 Y:2012 | 05 | 2012 | Use cooling tower water instead of refrigeration | $2,762 | $5,000 | |
| MAS028 #04 Y:2012 | 04 | 2012 | Recover waste heat from equipment | $3,781 | - | |
| MAS028 #03 Y:2012 | 03 | 2012 | Turn off equipment when not in use | $4,815 | $4,000 | |
| MAS028 #02 Y:2012 | 02 | 2012 | Reduce ventilation air | $22,269 | $9,650 | |
| MAS028 #01 Y:2012 | 01 | 2012 | Use cooling tower water instead of refrigeration | $37,819 | $31,800 | |
| MAS025 #05 Y:2012 | 05 | 2012 | Use properly designed and sized hvac equipment | $4,171 | $4,300 | |
| MAS025 #04 Y:2012 | 04 | 2012 | Insulate bare equipment | $5,622 | $935 | |
| MAS025 #03 Y:2012 | 03 | 2012 | Use / purchase optimum sized compressor | $7,097 | - | |
| MAS025 #02 Y:2012 | 02 | 2012 | Reduce ventilation air | $11,105 | $10,770 | |
| MAS025 #01 Y:2012 | 01 | 2012 | Recover waste heat from equipment | $50,701 | $22,000 |