Assessment Year | 2013 |
---|---|
Principal Product | Circuit boards |
NAICS | 334418: Printed Circuit Assembly (Electronic Assembly) Manufacturing |
SIC | 3679: Electronic Components, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
55,000
ft2
|
Annual Production | 552,000
pieces
|
Production Hrs. Annual | 2,040
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $114,694 | 1,215,456 |
kWh
|
$0.094 |
Electricity Demand | $63,898 | 5,482 |
kW-mo/yr
|
$11.66 |
Electricity Fees | $3,025 | - |
|
- |
Natural Gas | $14,880 | 1,251 |
MMBtu
|
$11.89 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $7,731 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,482 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.1331: Burn a less expensive grade of fuel | $4,116 | $500 |
$6,249
67,198
kWh
|
$(-2,133.0)
-
MMBtu
|
- | |
02 | 2.7314: Reduce ventilation air | $1,256 | $1,795 |
$664
7,137
kWh
|
$592
-
MMBtu
|
- | |
03 | 2.8121: Apply for tax-free status for energy purchases | $889 | $200 | - | - | $889 | |
04 | 2.7314: Reduce ventilation air | $738 | $1,638 |
$390
4,197
kWh
|
$348
-
MMBtu
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $599 | $600 |
$599
6,444
kWh
|
- | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $133 | $100 |
$133
1,428
kWh
|
- | - | |
TOTAL RECOMMENDED | $7,731 | $4,833 |
$8,035
86,404
kWh
|
$(-1,193.0)
-
MMBtu
|
$889 | ||
TOTAL IMPLEMENTED | $3,482 | $4,233 |
$1,653
17,778
kWh
|
$940
-
MMBtu
|
$889 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs