ITAC Assessment: MO0005
ITAC logo
ITAC Assessment: MO0005
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product CHARCOAL & LIGHTER FLUID
NAICS
n/a
SIC 2861: Gum and Wood Chemicals
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area
n/a
Annual Production 80,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $92,850 2,053,927
kWh
LPG $164,634 53,861
MMBtu
Fuel Oil #2 $2,720 560
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,197 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,262

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings
01 2.2511: Insulate bare equipment $2,439 $3,511 - $2,439
-
MMBtu
02 2.4131: Size electric motors for peak operating efficiency $19,712 $9,886 $19,712
436,401
kWh
-
03 2.2531: Re-size charging openings or add movable cover or door $6,935 $351 - $6,935
-
MMBtu
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,436 $3,500 $2,436
53,927
kWh
-
05 2.1123: Install automatic stack damper $585 $175 - $585
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $90 $72 $90
2,052
kWh
-
TOTAL RECOMMENDED $32,197 $17,495 $22,238
492,380
kWh
$9,959
-
MMBtu
TOTAL IMPLEMENTED $25,262 $17,144 $22,238
492,380
kWh
$3,024
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs