Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Printed Circuit Boards
NAICS 334418: Printed Circuit Assembly (Electronic Assembly) Manufacturing
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 210
Plant Area 110,000
ft2
Annual Production 2,628
thousand feet
Production Hrs. Annual 8,500
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $496,462 6,349,440
kWh
Electricity Demand $167,190 15,535
kW-mo/yr
Electricity Fees $9,000 -
LPG $3,911 123
MMBtu
Fuel Oil #4 $476,102 19,309
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $78,696 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,171

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #4 Savings
01 2.2437: Recover waste heat from equipment $50,701 $22,000 - $50,701
-
MMBtu
02 2.7314: Reduce ventilation air $11,105 $10,770 $2,597
33,212
kWh
$8,508
-
MMBtu
03 2.4226: Use / purchase optimum sized compressor $7,097 - $7,097
90,750
kWh
-
04 2.2511: Insulate bare equipment $5,622 $935 - $5,622
-
MMBtu
05 2.7233: Use properly designed and sized hvac equipment $4,171 $4,300 $4,171
53,338
kWh
-
TOTAL RECOMMENDED $78,696 $38,005 $13,865
177,300
kWh
$64,831
-
MMBtu
TOTAL IMPLEMENTED $4,171 $4,300 $4,171
53,338
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs