270
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Capacitor, resistor, coil, transformer, and other inductor manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| MI0321 #04 Y:2017 | 04 | 2017 | Use or replace with energy efficient substitutes | $6,777 | $5,492 | |
| MI0321 #03 Y:2017 | 03 | 2017 | Turn off equipment when not in use | $7,233 | $3,600 | |
| MI0321 #02 Y:2017 | 02 | 2017 | Clean or color roof to reduce solar load | $10,816 | $7,589 | |
| MI0321 #01 Y:2017 | 01 | 2017 | Use optimum thickness insulation | $17,954 | $21,920 | |
| SD0544 #08 Y:2017 | 08 | 2017 | Use waste heat steam for absorption refrigeration | $2,798 | $7,832 | |
| SD0544 #07 Y:2017 | 07 | 2017 | Use photocell controls | $3,481 | $10,611 | |
| SD0544 #06 Y:2017 | 06 | 2017 | Use or replace with energy efficient substitutes | $3,765 | $3,500 | |
| SD0544 #05 Y:2017 | 05 | 2017 | Isolate hot or cold equipment | $5,008 | $2,160 | |
| SD0544 #04 Y:2017 | 04 | 2017 | Use most efficient type of electric motors | $5,488 | $8,800 | |
| SD0544 #03 Y:2017 | 03 | 2017 | Use adjustable frequency drive or multiple speed motors on existing system | $12,835 | $26,705 | |
| SD0544 #02 Y:2017 | 02 | 2017 | Utilize higher efficiency lamps and/or ballasts | $15,529 | $41,589 | |
| SD0544 #01 Y:2017 | 01 | 2017 | Replace electrically-operated equipment with fossil fuel equipment | $23,627 | $14,788 | |
| SU0412 #09 Y:2016 | 09 | 2016 | Conserve energy by efficient use of vending machines | $119 | $576 | |
| SU0412 #08 Y:2016 | 08 | 2016 | Utilize higher efficiency lamps and/or ballasts | $1,742 | $6,797 | |
| SU0412 #07 Y:2016 | 07 | 2016 | Eliminate/reduce an operation | $5,577 | $9,195 | |
| SU0412 #06 Y:2016 | 06 | 2016 | Utilize higher efficiency lamps and/or ballasts | $1,305 | $1,707 | |
| SU0412 #05 Y:2016 | 05 | 2016 | Use waste heat from hot flue gases to preheat | $3,474 | $3,632 | |
| SU0412 #04 Y:2016 | 04 | 2016 | Install / repair insulation on steam lines | $98 | $78 | |
| SU0412 #03 Y:2016 | 03 | 2016 | Insulate bare equipment | $296 | $169 | |
| SU0412 #02 Y:2016 | 02 | 2016 | Install compressor air intakes in coolest locations | $1,342 | $480 |