ITAC Assessment: SU0412
ITAC logo
ITAC Assessment: SU0412
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Capacitors
NAICS 334416: Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing
SIC 3675: Electronic Capacitors
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 112,000
ft2
Annual Production 7,500,000
pieces
Production Hrs. Annual 6,110
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $213,846 5,359,036
kWh
Electricity Demand $59,353 9,716
kW-mo/yr
Electricity Fees $254 -
Natural Gas $46,466 8,980
MMBtu
TOTAL YEARLY COSTS $319,919
RECOMMENDED SAVINGS* $14,107 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7111: Reduce illumination to minimum necessary levels $154 - $110
2,574
kWh
$44
-
kW-mo/yr
- - -
02 2.4221: Install compressor air intakes in coolest locations $1,342 $480 $1,342
33,550
kWh
- - - -
03 2.2511: Insulate bare equipment $296 $169 - - $296
-
MMBtu
- -
04 2.2136: Install / repair insulation on steam lines $98 $78 - - $98
-
MMBtu
- -
05 2.2414: Use waste heat from hot flue gases to preheat $3,474 $3,632 - - $3,474
-
MMBtu
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,305 $1,707 $315
7,884
kWh
$66
-
kW-mo/yr
- $625 $299
07 3.1161: Eliminate/reduce an operation $5,577 $9,195 $(-94.0)
(-2,340)
kWh
$(-440.0)
-
kW-mo/yr
- $1,300 $4,811
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,742 $6,797 $1,221
30,530
kWh
$521
-
kW-mo/yr
- - -
09 2.6211: Conserve energy by efficient use of vending machines $119 $576 $119
2,979
kWh
- - - -
TOTAL RECOMMENDED $14,107 $22,634 $3,013
75,177
kWh
$191
-
kW-mo/yr
$3,868
-
MMBtu
$1,925 $5,110
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs