Assessment Year | 2003 |
---|---|
Principal Product | Plastic Parts |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 400 |
Plant Area |
86,000
ft2
|
Annual Production | 175,000,000
pieces
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,064,070 | 12,642,094 |
kWh
|
$0.084 |
Electricity Demand | $272,094 | 24,928 |
kW-mo/yr
|
$10.92 |
Natural Gas | $6,782 | 818 |
MMBtu
|
$8.29 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $184,047 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $82,278 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $7,672 | - |
$6,471
76,877
kWh
|
$1,201
-
kW-mo/yr
|
- | |
02 | 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings | $2,510 | - |
$2,510
29,816
kWh
|
- | - | |
03 | 2.6231: Utilize controls to operate equipment only when needed | $12,968 | $3,164 |
$10,940
129,971
kWh
|
$2,028
-
kW-mo/yr
|
- | |
04 | 2.4322: Use or replace with energy efficient substitutes | $1,638 | $877 |
$1,390
16,511
kWh
|
$248
-
kW-mo/yr
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $13,641 | $10,047 |
$11,508
136,721
kWh
|
$2,133
-
kW-mo/yr
|
- | |
06 | 2.4133: Use most efficient type of electric motors | $39,106 | - |
$32,991
391,978
kWh
|
$6,115
-
kW-mo/yr
|
- | |
07 | 2.7141: Lower light fixtures in high ceiling areas | $3,821 | $3,895 |
$3,224
38,304
kWh
|
$597
-
kW-mo/yr
|
- | |
08 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $51,465 | $60,181 |
$34,441
409,185
kWh
|
$17,024
-
kW-mo/yr
|
- | |
09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,206 | $3,741 |
$1,860
22,100
kWh
|
$346
-
kW-mo/yr
|
- | |
10 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $12,536 | $38,576 |
$10,579
125,686
kWh
|
$1,957
-
kW-mo/yr
|
- | |
11 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,587 | $34,108 |
$7,244
86,067
kWh
|
$1,343
-
kW-mo/yr
|
- | |
12 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,463 | $14,493 |
$2,915
34,637
kWh
|
$548
-
kW-mo/yr
|
- | |
13 | 2.7135: Install occupancy sensors | $934 | $4,585 |
$586
6,959
kWh
|
$348
-
kW-mo/yr
|
- | |
14 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $3,500 | - | - | - |
$3,500
-
lb
|
|
15 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $15,500 | $9,900 | - | - |
$15,500
-
lb
|
|
16 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $4,500 | $18,000 | - | - |
$4,500
-
lb
|
|
TOTAL RECOMMENDED | $184,047 | $201,567 |
$126,659
1,504,812
kWh
|
$33,888
-
kW-mo/yr
|
$23,500
-
lb
|
||
TOTAL IMPLEMENTED | $82,278 | $50,029 |
$49,971
593,712
kWh
|
$8,807
-
kW-mo/yr
|
$23,500
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs