ITAC Assessment: OK0119
ITAC logo
ITAC Assessment: OK0119
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product ANIMAL & POULTRY FEED
NAICS
n/a
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $5
M
to 10
M
# of Employees 45
Plant Area
n/a
Annual Production 70,000
ton
Production Hrs. Annual 4,030
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $117,412 2,301,583
kWh
Natural Gas $50,504 14,291
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $636 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $636

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $45 $500 $45
1,758
kWh
-
02 2.7261: Install timers and/or thermostats $216 - - $216
-
MMBtu
03 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $375 - $375
13,482
kWh
-
TOTAL RECOMMENDED $636 $500 $420
15,240
kWh
$216
-
MMBtu
TOTAL IMPLEMENTED $636 $500 $420
15,240
kWh
$216
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs