| Assessment Year | 2000 |
|---|---|
| Principal Product | Aggregates and Asphalt |
| NAICS |
n/a
|
| SIC | 2951: Asphalt Paving Mixtures and Blocks |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
280,000
ft2
|
| Annual Production | 1,400,000
ton
|
| Production Hrs. Annual | 7,200
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $471,610 | 8,940,797 |
kWh
|
$0.053 |
| Electricity Demand | $152,034 | 33,312 |
kW-mo/yr
|
$4.56 |
| Electricity Fees | $4,176 | - |
|
- |
| Natural Gas | $190,848 | 94,524 |
MMBtu
|
$2.02 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $318,686 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $272,611 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $11,527 | $8,000 |
$9,980
189,039
kWh
|
$3,280
-
kW-mo/yr
|
$(-1,733.0)
-
MMBtu
|
|
| 02 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $271,210 | $1,150,000 |
$357,142
5,881,594
kWh
|
$76,608
-
kW-mo/yr
|
$(-162,540.0)
-
MMBtu
|
|
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,260 | $17,300 |
$4,219
80,012
kWh
|
$1,041
-
kW-mo/yr
|
- | |
| 04 | 2.4131: Size electric motors for peak operating efficiency | $862 | $388 |
$682
12,896
kWh
|
$180
-
kW-mo/yr
|
- | |
| 05 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $539 | - |
$342
6,448
kWh
|
$197
-
kW-mo/yr
|
- | |
| 06 | 4.114: Add/modify equipment to improve drying process | $29,288 | - |
$13,624
258,206
kWh
|
$3,361
-
kW-mo/yr
|
$12,303
-
MMBtu
|
|
| TOTAL RECOMMENDED | $318,686 | $1,175,688 |
$385,989
6,428,195
kWh
|
$84,667
-
kW-mo/yr
|
$(-151,970.0)
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $272,611 | $1,150,388 |
$358,166
5,900,938
kWh
|
$76,985
-
kW-mo/yr
|
$(-162,540.0)
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs