ITAC Assessment: SD0236
ITAC logo
ITAC Assessment: SD0236
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Aggregates and Asphalt
NAICS
n/a
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 280,000
ft2
Annual Production 1,400,000
ton
Production Hrs. Annual 7,200
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $471,610 8,940,797
kWh
Electricity Demand $152,034 33,312
kW-mo/yr
Electricity Fees $4,176 -
Natural Gas $190,848 94,524
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $318,686 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $272,611

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $11,527 $8,000 $9,980
189,039
kWh
$3,280
-
kW-mo/yr
$(-1,733.0)
-
MMBtu
02 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $271,210 $1,150,000 $357,142
5,881,594
kWh
$76,608
-
kW-mo/yr
$(-162,540.0)
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,260 $17,300 $4,219
80,012
kWh
$1,041
-
kW-mo/yr
-
04 2.4131: Size electric motors for peak operating efficiency $862 $388 $682
12,896
kWh
$180
-
kW-mo/yr
-
05 2.7121: Utilize daylight whenever possible in lieu of artificial light $539 - $342
6,448
kWh
$197
-
kW-mo/yr
-
06 4.114: Add/modify equipment to improve drying process $29,288 - $13,624
258,206
kWh
$3,361
-
kW-mo/yr
$12,303
-
MMBtu
TOTAL RECOMMENDED $318,686 $1,175,688 $385,989
6,428,195
kWh
$84,667
-
kW-mo/yr
$(-151,970.0)
-
MMBtu
TOTAL IMPLEMENTED $272,611 $1,150,388 $358,166
5,900,938
kWh
$76,985
-
kW-mo/yr
$(-162,540.0)
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs