Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,617

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Semiconductor and other electronic component manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0262 #08 Y:2024 Optimize plant power factor $5,129 $12,300
UU0262 #07 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $2,117 $834
UU0262 #06 Y:2024 Minimize operation of equipment maintained in standby condition $720 $1,680
UU0262 #05 Y:2024 Use or replace with energy efficient substitutes $762 $2,640
UU0262 #04 Y:2024 Reduce air conditioning load by evaporating water from roof $13,561 $178,488
UU0262 #03 Y:2024 Insulate bare equipment $24,314 $29,878
UU0262 #02 Y:2024 Use waste heat to produce steam to drive a steam turbine-generator $14,276 $180,000
UU0262 #01 Y:2024 Use waste heat steam for absorption refrigeration $12,361 $217,800
UC2416 #10 Y:2024 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $55,311 $819,496
UC2416 #09 Y:2024 Replace existing hvac unit with high efficiency model $80,097 $301,647
UC2416 #08 Y:2024 Replace existing chiller with high efficiency model $240,811 $2,527,500
UC2416 #07 Y:2024 Install / repair insulation on steam lines $294 $139
UC2416 #06 Y:2024 Insulate bare equipment $3,536 $1,750
UC2416 #05 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $73,494 $29,062
UC2416 #04 Y:2024 Install occupancy sensors $510 $218
UC2416 #03 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,767 $1,553
UC2416 #02 Y:2024 Recover waste heat from equipment $159,604 $5,236
UC2416 #01 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $19,662 $1,600
SJ0029 #06 Y:2024 Change rate schedules or other changes in utility service $10,952 -
SJ0029 #05 Y:2024 Insulate bare equipment $378 $574