ITAC Assessment: SF0648
ITAC logo
ITAC Assessment: SF0648
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Contract Manufacturing and Semiconductor Capital Equipment Parts
NAICS 334413: Semiconductor and Related Device Manufacturing
SIC 3674: Semiconductors and Related Devices
Sales Range $50
M
to 100
M
# of Employees 243
Plant Area 80,000
ft2
Annual Production 25,000
units
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,083,297 4,186,978
kWh
Electricity Demand $265,047 8,643
kW-mo/yr
Natural Gas $37,041 1,766
MMBtu
TOTAL YEARLY COSTS $1,385,385
RECOMMENDED SAVINGS* $129,855 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.6218: Turn off equipment when not in use $31,876 - $31,876
123,216
kWh
- - - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,247 - $4,127
15,955
kWh
- - $(-2,880.0) - -
03 2.7226: Use computer programs to optimize hvac performance $5,174 $2,069 $1,713
6,623
kWh
- $3,461
-
MMBtu
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $24,382 $32,268 $16,734
64,686
kWh
$6,383
-
kW-mo/yr
- $1,260 $5 -
05 2.3141: Use battery storage for demand control $25,681 $73,820 $(-1,465.0)
(-17,069)
kWh
$27,146
-
kW-mo/yr
- - - -
06 4.212: Adopt in-house material generation $41,495 $54,725 - - - - - $41,495
TOTAL RECOMMENDED $129,855 $162,882 $52,985
193,411
kWh
$33,529
-
kW-mo/yr
$3,461
-
MMBtu
$(-1,620.0) $5 $41,495
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs