| Assessment Year | 2009 |
|---|---|
| Principal Product | 16 oz. Aquafina Bottled Water |
| NAICS | 312111: Soft Drink Manufacturing |
| SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
| Sales Range | $10 M to 50M |
| # of Employees | 18 |
| Plant Area |
140,000
ft2
|
| Annual Production | 8,000,000
units
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $515,260 | 6,621,000 |
kWh
|
$0.078 |
| Natural Gas | $162,483 | 11,653 |
MMBtu
|
$13.94 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $120,978 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $105,844 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.6218: Turn off equipment when not in use | $105,200 | - | - |
$105,200
-
MMBtu
|
|
| 02 | 2.7135: Install occupancy sensors | $644 | $140 |
$644
8,946
kWh
|
- | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $2,050 | $5,000 |
$2,050
26,320
kWh
|
- | |
| 04 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $1,500 | $880 | - |
$1,500
-
MMBtu
|
|
| 05 | 2.4226: Use / purchase optimum sized compressor | $4,330 | $8,800 |
$4,330
55,000
kWh
|
- | |
| 06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,254 | $35,000 |
$7,254
93,000
kWh
|
- | |
| TOTAL RECOMMENDED | $120,978 | $49,820 |
$14,278
183,266
kWh
|
$106,700
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $105,844 | $140 |
$644
8,946
kWh
|
$105,200
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs